Connection order:
follow panel numbering.
A. Connect the pigtails to the patch panel.
B. Route the fibres in the guiding pegs and to
the combs at the entry of the trays.
C. Coil the fibres awaiting splicing in the
trays.
A
B
1
24
V. 100
Routing in the
guiding pegs
Order of the splices in the tray:
2
3
4
1
5
6
8
9
10
7
11
12
C
C
Unstrip the fibres
5mm
after the
comb.
3.7 Installing the pigtails