
Page | 41
Although you might well never even notice, a two minute initialization period begins after you
start (or re-start) TriCaster. This ‘warm-up’ period allows the system to stabilize, ensuring
consistent performance of various components (for example, video clips playing in the DDR
before the end of initialization could skip some frames). See Section 6.5.1 for more information.
At this time, though, we want to begin our tour of the
Live Desktop
with consideration of the
monitoring features and options it provides.
4.3
MONITORING
4.3.1
PROGRAM OUTPUT
Inevitably, you’ll be paying a lot of attention to the main
Program Output
monitor (Figure 31),
found at the right side of the
Live
Desktop
in the upper (monitoring) section. This display shows
you what you are sending to downstream devices – and your viewing audience.
Figure 31
Situated beneath the monitor itself are
Stream, Record and Grab
buttons, their respective
Configuration
buttons and time/counter fields (we’ll look at those features later).
Summary of Contents for Tricaster TCXD850
Page 1: ......
Page 3: ...TRICASTER TCXD850...
Page 4: ......
Page 16: ...xii D 11 2 Misc 309 E Reliability Testing 311 Index 313 Credits 319...
Page 18: ......
Page 20: ......
Page 54: ......
Page 104: ......
Page 154: ......
Page 178: ......
Page 196: ......
Page 206: ......
Page 216: ......
Page 234: ......
Page 254: ......
Page 264: ......
Page 266: ......
Page 308: ......
Page 326: ......
Page 328: ......
Page 334: ......
Page 336: ...Page 320 ss...