Installation and commissioning
Unpacking
Manual TFT Position indicators
15
4
Installation and commissioning
The EAZ-TFT may only be installed by a trained electrician.
Information on the qualifications required by the installing engineer can be found in the manual
FST
Installation & Commissioning
See „1.3 Further information“ page 6
.
Electrostatic charging
›
Keep the electronic assembly in its original packaging until installation to prevent damage.
›
Before opening the original packaging, a static discharge must be performed!
To do this, touch a grounded piece of metal.
›
During work on electronic assemblies, periodically repeat this discharge procedure!
›
Equip all bus inputs/outputs not in use with a terminal resistor (terminator) to prevent malfunctions.
4.1
Unpacking
►
Remove the packaging material completely.
►
Peel the protective film off the display screen.
After installation, it is no longer possible to remove the protective film
.
4.2
Installation
The clarity of the display depends on the viewing angle; the installation position of the display is there-
fore critical in achieving an optimum result.
►
Determine the installation position before mounting.
►
Make sure that the installation position matches the orientation of the display.
›
EAZ-TFT.45 – The display is positioned symmetrically on the assembly.
›
EAZ-TFT.110 – The display is not positioned symmetrically on the assembly.
›
EAZ-TFT.210 – The display is not positioned symmetrically on the assembly.
Pressure or tension can damage the circuit board.
►
Do not overtighten the nuts!