- 53 -
NL4258/4330G4 EDGE
www.NewLeader.com
(800) 363-1771
312521-AA-C
1� Make sure unit has been properly serviced and is in good operating condition� It is recommended to
run the spreader prior to loading material to ensure acceptable operation�
2� Set manual machine settings in controller per Controller section in this manual�
3� Program controller with correct data for material and application�
4� Adjust feedgate to appropriate setting�
5� Adjust spinner to give spread pattern desired� See “Spread Pattern” and “Controller” sections for
details� Calibrate and spread pattern test for any new material�
6� Fill unit with material to be spread�
7� Engage hydraulics�
8� Begin spreading�
CAUTION
Drive only at speeds which permit good control of vehicle!
General Operating Procedures
NOTICE!
CHANGE HYDRAULIC OIL FILTER AFTER FIRST WEEK (OR NOT MORE THAN 50 HOURS) OF
OPERATION ON A UNIT�