background image

Check Box for These Contents 

In the event of missing or defective parts please call our customer service dept. at 

1 800 282 9346 (Mon. to Fri. 8:00 AM to 4:00 PM EST).

(UK Tel: (44) 2038 687160 (Mon. to Fri.  1:00 PM to 10:00 PM GMT).

1.

Arched Top Rail

 (1)

 - 

10857

2.

Post Caps 

(2)

 - 

10748-1

3.

Post - Left 

(1)

 

10858

4.

Post - Right 

(1)

 

10859

5.

Vertical Spindles 

(3)

 - 

10860

6.

Horizontal Spindles 

(7)

 

10861

7.

Bottom Rail 

(1)

 

10862

8.

Ground Mounting Extensions 

(2)

 - 

10863

9.

5/8

” 

(16 mm) 

Self-Auguring Stainless Steel Screw 

(12)

 - 

20016

 

Tools You Will Need

• Cordless Drill
• Hammer
• Tape Measure
• Level
• Shovel

General Information

Read Instructions through carefully before beginning assembly.

• When assembling components, place on a non-abrasive surface

(i.e. shipping box) 

to avoid scratching.

• We recommend an area approx 5’x 8’ 

(1.5 m x 2.4 m) 

for unobstructed

 

assembling.

• You should not need to use excessive force when assembling component.

The London Trellis

Please read through before starting assembly.

ASSEMBLY INSTRUCTIONS

1

1

2

9

Not to Scale

7

3

5

6

IMPORTANT:  CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.

V2.

2

/

072717

8

4.5 in

(11 cm)

69 in

(175 cm)

27 in

(69 cm) 

30 in

(76 cm)

78 in

(198 cm) 

1.5 in

(4 cm) 

79.2 in

(201 cm)

4

www.newenglandarbors.com

www.newenglandarbors.co.uk

Summary of Contents for London Trellis

Page 1: ...d Cordless Drill Hammer Tape Measure Level Shovel General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 5 x 8 1 5mx2 4m for unobstructed assembling You should not need to use excessive force when assembling component The London Trellis Please read ...

Page 2: ...op arched rail end into the post and progressively into each of the vertical spindles Proceed to attach the second post to the trellis assembly as shown below 1 2 3 4 STEP ONE NOTE There are locking tabs located at the ends of the horizontal rails Once inserted and pushed into the routed holes they will lock into place 1 2 3 4 1915 Dove St Port Huron MI USA 48060 Toll Free Phone 1 800 282 9346 Tol...

Page 3: ...ax 1 877 464 9286 www edenarbors com STEP TWO Secure the trellis with 8 of the provided screws at the locations shown below Ensure the trellis posts and rails are square to each other Install Screws Push the post caps to the posts as illustrated Install Post Caps The London Trellis ...

Page 4: ...f high winds etc We have provided two ground mounting extensions for securing the trellis either into the ground or into a concrete footing If you are installing your trellis directly to the wall of your home or on a wood deck or concrete surface please see your hardware store for the appropriate galvanized bracket hardware STEP THREE Install the Ground Mounting Extensions Insert the ground mounti...

Reviews: