
16
User Manual – Gigabit PoE Supply NPS-30W | BDA 579 V2 2020/06
Operation
5.4.2 Rack panel NRP1RU-2A
Scope of delivery
1 rack panel
1
2
T
Remove the rubber protection.
T
Place the device in the rack panel.
T
Fix the device with the four screws.
T
Remove the 4 screws on the front of the device.
Assembling the rack panel
Prepare the following tools:
O
Crosshead screwdriver
3