Install Disks

Install at least one, and up to 60, disks before powering on your ReadyNAS for the first time.

If you install previously formatted disks, you must use your ReadyNAS to reformat them the 
first time you power on the system. For information about reformatting disks, see 

Reformat 

Disks

 

on page 10.

Note: 

Reformatting disks deletes all data on the disks.

When you power on your system for the first time or if you reset your system to its 
factory default settings, the optimal RAID mode and level are automatically selected for 
you based on the number of disks that are installed. If desired, you can later change the 
RAID settings manually. For information about RAID settings, including changing RAID 
settings, see the 

ReadyNAS OS 6 Software User Manual

. A link to this manual is available at 

www.netgear.com/support/product/ReadyNAS_OS_6

 or through a link in the product’s user 

interface. 

 

¾

To install your disks:

1.  Pull the chassis forward so that panel on the top front of the chassis is clear of the rack.
2.  Press the front pair of release buttons on the sides of the chassis and push the top cover 

toward the front until you can lift it off.

PUSH

PUSH

Summary of Contents for ReadyNAS RR4360S

Page 1: ...Installation and Quick Start ReadyNAS RR4360S RR4360X...

Page 2: ...kage Contents 3 Prepare the Installation Site 3 Install the System in a Rack 4 Precautions 4 Rack Installation 5 Install Cable Management 6 Install Disks 7 Basic Setup 9 Reformat Disks 10 Additional I...

Page 3: ...ng Mount the equipment into a rack so that a hazardous condition does not arise due to uneven mechanical loading Circuit overloading Consider the equipment s connection to the power supply circuitry a...

Page 4: ...ions Ensure that the leveling jacks on the bottom of the rack are fully extended to the floor with the full weight of the rack resting on them In single rack installations attach stabilizers to the ra...

Page 5: ...e chassis insert the hooks in the front surface of the outer rail into holes in the front of the rack and press the rail down to fasten it to the rack 8 Repeat with the right rail and right side of th...

Page 6: ...t hardware 1 Attach the rack bracket to the arm assembly using three bolts 2 Attach the chassis bracket to the bracket on the left rear of the RR4360 chassis using two bolts 3 Attach the rack bracket...

Page 7: ...imal RAID mode and level are automatically selected for you based on the number of disks that are installed If desired you can later change the RAID settings manually For information about RAID settin...

Page 8: ...es in your drive Note The following figure illustrates how disk numbers are assigned based on their position in the chassis When you reinsert the drive and tray into a slot the weight of the drive sea...

Page 9: ...supplies 4 Use an Ethernet cable to connect an Ethernet port on the storage system to your network 5 If necessary press the Power button to turn on the system 6 Wait for the Power LED to turn solid bl...

Page 10: ...manual for your system 3 Press and hold the Reset button 4 Press the Power button The system powers on 5 Continue pressing the Reset button for about five seconds until the system enters the boot menu...

Page 11: ...cefully power off your storage system 1 Press the Power button on the front panel of the system The Power LED blinks prompting you to confirm the shutdown 2 Press the Power button again The system shu...

Page 12: ...er manuals and join our community We recommend that you use only official NETGEAR support resources Trademarks NETGEAR Inc NETGEAR and the NETGEAR Logo are trademarks of NETGEAR Inc Any non NETGEAR tr...

Reviews: