Install Hardware
35
3.8. Rail Kit Assembly
3.8.1. Installing the Rack Brackets
Preparing for the Installation
• Review all the tasks required to install and configure the system
• Review the electrical requirements and power supply input voltage information
• Examine the system’s shipping kit contents and assemble the required tools for installation
• Review ESD requirements and take safety precautions
• Before installing the system into a rack, install any optional components into the system
• Stabilize the rack before installing the system, if necessary
Use caution when removing the inner rail from the rail kit assembly. The rails can slide
out and cause personal injury or damage to the server.
Installing the Rails
1. Press the release tab (A) and remove the inner rail from the rail kit assembly.
Figure 3.17. Disassembling the Rails
A
2. Align and insert the holes on the inner rail into the pins on the side of the chassis.
3. Slide the inner rail until the latch key on the rail locks and is secure to the chassis.
4. Install the screw(s) to the inner rail.
Summary of Contents for Aeon J460 M2 JBOD
Page 1: ...Netberg Aeon J460 M2 JBOD ...
Page 2: ...Netberg Aeon J460 M2 JBOD ...
Page 7: ...1 Chapter 1 Netberg Aeon J460 M2 JBOD ...
Page 11: ...5 Chapter 2 About JBOD ...
Page 25: ...19 Chapter 3 Install Hardware ...
Page 34: ...Install Hardware 28 Figure 3 10 Installing PSU A B 1 2 ...
Page 45: ...Install Hardware 39 Figure 3 23 Installing Cable Management Arm 2 3 7 Right Rear ...