13
Operation
Preparing hot water
1 Mount steam pipe if necessary.
2 Position cup under steam pipe.
3 Turn hot water/steam lever to the front,
hot water flows into the cup.
4 Once the cup contains the required
amount, turn hot water/steam lever to the
back.
Heating up beverages
1 Press button "Steam".
2 Wait till button "On/Off" doesn't blink
(warm up phase finished).
3 Position cup under steam pipe.
4 Immerse steam pipe approx. 1 cm deep in
beverage.
5 Turn hot water/steam lever to the front
and to the back after beverage is heated
up.
6 Press button "Steam" again to cool down
machine.
1
2
3
4
5
6
1
2
3
4
~
30 s
Note
Coffee machine cools down after
2 minutes automatically.
!
Steam nozzle gets very hot.
Don't touch bottom of cup.
Steam rises from drip tray.
Summary of Contents for EF 737
Page 1: ...1 en Service Manual Coffee Machine EF 737 EF 741 01 2004 DOG...
Page 52: ...52...
Page 60: ...60...