Item
Description/Recommendation
Use
Cable
Solid 3 Conductor #22 AWG
(black/green/red) Part # 6431-
352
Connect L900 MIU to encoder register.
Moisture Protection
Compound
Novaguard sealant
Part# 96018-072
Cover exposed wires and terminal screws on
register and L900 MIU.
Scotchloks
Part# 8138-125
Connect wall L900 MIU or replacement pit
L900 MIU to encoder register.
Site Work Order
Documentation provided by your
utility
Receive and record information about the
work site.
Table 9 – Recommended Materials
Safety and Preliminary Checks
Observe the following safety and preliminary checks before and
during each installation.
l
Verify that you are at the location specified on the site work
order.
l
Verify that the site is safe for you and your equipment.
l
Notify the customer of your presence and tell them you need
access to the water meter.
l
Write in the ID number(s) of the L900 MIU you are about to
install, if the site work order does not have an L900 MIU ID
number.
l
Verify that the ID number(s) matches the ID number(s) on the
L900 MIU you are about to install, if the site work order
already has a L900 MIU ID number.
Verifying/Preparing the Encoder Register
The L900 MIU is designed for use with the following encoder
registers:
l
ARB V
l
ProRead
10
L900 MIU Pit and Wall Installation and Maintenance Guide
Chapter 3: General Installation Guidelines
Summary of Contents for L900 MIU Pit
Page 2: ......
Page 3: ...L900 MIU Pit and Wall Installation and Maintenance Guide...