SKS - Steam to Steam Humidifier
Installation Instructions and User Manual
10
Stage 1 – Unit Positioning, Mounting and Levelling
Positioning the
Humidifier
SKS humidifier must be installed to ensure the steam hose length is kept to the
shortest possible length.
Maximum steam hose length between the humidifier and the steam distribution
pipes is 5m.
SKS humidifier must be installed with provision for the Steam supply piping
connections and Steam condensate trap installation.
The humidifier must be located in an area that is fully accessible for inspection
and servicing. Observe the minimum access distances as shown in figure 6.
SKS humidifier can be provided with adjustable legs (optional) in order to ensure
proper level when installed directly on the floor.
Provide a level, solid foundation for the humidifier.
Ensure that the floor beneath the humidifier is water proof to withstand any
water spillage during servicing or if a problem occurs.
Ensure that the humidifier is properly attached through its legs using anchors to
the floor.
SKS-100 & 130-SLP and SKS-200-CHP Models can be ceiling hung by using
the appropriate Lifting and hanging bracket.
SKS humidifier must be levelled, in order to ensure proper slop for condensate
return by heat exchanger.
Ambient condition
The humidifier location must have an ambient temperature of less than 30
˚C.
Minimum
Clearances
(Fig. 5)
SKS-200-CHP
Other Models
(Fig. 6)
Note: Above minimum clearances are indicated for inspection and servicing access.
SKS Humidifier is designed for a 0 clearance to combustible material.
70 cm
side to side
78.9 cm
center to center
1
1
0
cm
SKSNeptronic
19 cm
69.5 cm
Rod and Nuts
9.6 cm min
Lifting and
Hanging
Bracket
0.60m
minimu
m
0.6
0m
min
imu
m
0.75m
minimum
0.6
0m
min
imu
m
1m
minimu
m
Summary of Contents for SKS-100-SLP
Page 38: ...Notes...
Page 39: ......