1) Locate suitable place for mounting the valve
assembly. Valve assembly should be
accessible for service and adjustment and
as close to the point-of-use as possible.
Wall anchors and anchoring hardware are
by others.
NOTE: Installation should be in accordance with
accepted plumbing practices.
3) Connect outlet of tempering valve to
spout using 1/2” NPT connections
provided (Refer to pg.8).
4) Turn on hot and cold water supplies. If any
leaks are observed, hand-tighten
connections as necessary to stop leaks
before proceeding.
2) Connect hot and cold water to supply
valve using 1/2” NPTE connections by others.
5) Turn on fixture and allow water to flow for 2
minutes. Measure water temperature at
outlet. If water is not at desired temperature,
adjust as necessary.
1) Loosen locknut.
3) Turn temperature stem counter-clockwise
for hotter or clockwise for colder outlet
temperature.
2) Turn on fixture and run water for at least 2
minutes. Allow supply temperature to
stabilize.
5) Re-check outlet temperature.
4) Tighten locknut to prevent accidental or
unauthorized temperature adjustment.
Temperature Adjustment
Valve Assembly Installation:
VALVE INSTALLATION & ADJUSTMENT
!
IMPORTANT
Flush supply lines of all foreign material such
as pipe dope, pipe chips, solder, sand etc.
before making up supply connections.
HINT: Angle stops are recommended
and is the responsibility of the installer.
LOCKNUT
WARMER
TEMPERATURE
STEM
Page 12 of 18
1
2
1
(For -MXTP Option):
NEO-METRO FIELD SERVICE
TOLL FREE
800-743-8259 •
LOCAL
626-855-4866 •
FAX
626-855-4863
INSTALLATION, OPERATIONS
& MAINTENANCE MANUAL
Please visit
for most current specifications.
www.neo-metro.com
Date: 06/10/19
Part #: 6216-019-000