![neno LEADX Ultra Assembly And Operating Instructions Manual Download Page 59](http://html1.mh-extra.com/html/neno/leadx-ultra/leadx-ultra_assembly-and-operating-instructions-manual_3953456059.webp)
NENO LEADX Ultra Manual
© NENO-CNC Schweiz 2023
Seite | 59
4.1.3 Alignment Tool
Article No.
Description
Quantity
1
C-Beam Profile
1
2
Alignment tool
1
Slide the alignment tool onto the HGR 15 rail and bring it close to the end of the rail. Tighten the M4
x 14 mm hexagon socket screw pre-assembled in chapter 4.1.1.
Repeat the process by moving the alignment tool and tightening all M4 x 14mm hexagon socket bolts
one by one.
When tightening the M4 x 14 mm hexagon socket bolts, pay attention to the amount of torque.
Tightening too hard can damage the screw head or Allen wrench.
.
Lower rail
Top rail