E-PAK 150 DX/300 DX/500 DX
EN
36
NOTE!
Detailed information regarding installation of an explosion
suppression systems can be found in the suppression system manual. Work is
only to be carried out by certified personnel.
8.1.1
Indoor installation
Ensure that the room where the unit is to be installed is well ventilated.
NOTE!
Never seal a small room with a E-PAK 150 DX/300 DX/500 DX
installed completely!
In some conditions, the unit may draw air directly into the high-pressure fan.
This may cause a dangerous underpressure in the room if air cannot enter
freely. There are to be two openings for ventilation, at least 250×250 mm
(10"×10") in size. One is to be placed up high and the other one down low.
8.1.2
Outdoor installation
If installed outdoors, also consider the following:
•
Cover the top of the unit to protect it from snow, rain or falling debris.
•
Install a lightning conductor, see Section ‘8.3 Electrical installation’.
8.2
Connections
Equipment such as cables and hoses is not supplied and is to be obtained
locally.
Figure 9 shows the normal connections to E-PAK 150 DX/300 DX/500 DX, as
follows:
1.
PS cable for remote start/stop.
2.
Incoming 3-phase power supply with Protective Earth (PE) conductor.
3.
Maintenance switch.
4.
Vent duct flange.
5.
Isolation device.
6.
Vacuum duct from workstations.
7.
Power cable.
8.
Duct between the unit and isolation device.
9.
Water and dirt trap. Compressed air supply is to be clean and dry.
10.
Compressed air valve, size G1/4" or G1/2".
11.
Compressed air line, Ø 6 mm nylon hose.
8.3
Electrical installation
WARNING!
Risk of electric shock.
Work with electric equipment is to be carried out by a qualified electrician.
NOTE!
National and local electric regulations are to be followed.
For electrical data, see Section ‘5.3.2 Electrical data’. Column F1 gives the
recommended mains fuses (slow) for different supply voltages.
Summary of Contents for E-PAK 300 DX
Page 2: ...E PAK 150 DX 300 DX 500 DX 2...
Page 7: ...E PAK 150 DX 300 DX 500 D 7...
Page 9: ...E PAK 150 DX 300 DX 500 DX 9 2 800 31 5 150 6 3 103 102 103 103 102 103 26 26 14 0 55 x12...
Page 10: ...E PAK 150 DX 300 DX 500 DX 10 4...
Page 12: ...E PAK 150 DX 300 DX 500 DX 12 A A B C D 6 667 C C 1174 C C 11 7 750 587 1990 8...
Page 13: ...E PAK 150 DX 300 DX 500 DX 13 1 2 3 5 6 7 8 4 9 10 11 A 9...
Page 14: ...E PAK 150 DX 300 DX 500 DX 14 1 2 3 5 4 1 13 14 15 3 5 6 7 4 16 8 9 10 11 2 17 12 10 11...
Page 15: ...E PAK 150 DX 300 DX 500 DX 15 0 I 12 13 14...
Page 16: ...E PAK 150 DX 300 DX 500 DX 16 16 17 18 19 15...
Page 17: ...E PAK 150 DX 300 DX 500 DX 17 20...
Page 18: ...E PAK 150 DX 300 DX 500 DX 18 21...
Page 19: ...E PAK 150 DX 300 DX 500 DX 19 22...
Page 20: ...E PAK 150 DX 300 DX 500 DX 20 23...
Page 21: ...E PAK 150 DX 300 DX 500 DX 21 24...
Page 22: ...E PAK 150 DX 300 DX 500 DX 22 25...
Page 23: ...E PAK 150 DX 300 DX 500 DX 23 26...
Page 178: ...E PAK 150 DX 300 DX 500 DX FI 178...
Page 274: ...E PAK 150 DX 300 DX 500 DX IT 274...
Page 370: ...E PAK 150 DX 300 DX 500 DX PL 370...
Page 402: ...E PAK 150 DX 300 DX 500 DX PT 372...
Page 406: ...E PAK 150 DX 300 DX 500 DX RU 404 2 4 EC Nederman Nederman 3...
Page 423: ...E PAK 150 DX 300 DX 500 DX 423 RU 9 3 3 12 1 10 E PAK 150 DX 300 DX 500 DX 10 1 ATEX...
Page 428: ...E PAK 150 DX 300 DX 500 DX RU 404 12 E PAK 150 DX 300 DX 500 DX 12 1 Nederman 12 1 PS 6 4 0 58...
Page 432: ...E PAK 150 DX 300 DX 500 DX RU 404 EX Y...
Page 433: ...E PAK 150 DX 300 DX 500 DX 433 RU B E PAK DX ISO 8573 1 5 100 GND1 GND1 GND1...
Page 434: ...E PAK 150 DX 300 DX 500 DX RU 404 GND1 GND1 105 GND1...
Page 486: ...E PAK 150 DX 300 DX 500 DX ZH 486 NL PE PS MIE MIT SSR TS...
Page 489: ...E PAK 150 DX 300 DX 500 DX 489 ZH Y...
Page 490: ...E PAK 150 DX 300 DX 500 DX ZH 490 B E PAK DX No ISO 8573 1 5 100 ohm GND1 GND1 GND1...
Page 491: ...E PAK 150 DX 300 DX 500 DX 491 ZH GND1 GND1 105 ohm GND1...
Page 492: ...www nederman com...