![Nedap PowerRouter PR50SB-PR/S24 Installation Manual Download Page 36](http://html1.mh-extra.com/html/nedap/powerrouter-pr50sb-pr-s24/powerrouter-pr50sb-pr-s24_installation-manual_3851892036.webp)
5 Software installation tool
PowerRouter • Back-up / Stand-alone • Installation Manual
34
EN
5.3.3 Standby
Select that the PowerRouter can go in standby. The
PowerRouter will go in to standby when there is no solar
power or battery power available.
5.3.4 Standby timer
Select a time interval, in which the PowerRouter goes to
standby.
5.4
Grid
5.4.1 Country
Set the country grid settings for a specific country.
CAUTION
It is not allowed to select another country, than the country
the PowerRouter will be installed.
5.4.2 EEG 2012
Set the dedicated parameters to your installation size to
comply with the German EEG 2012 regulation.
5.4.3 VDE 4105
Change the grid settings to comply with the VDE 4105 per
local utility requirements.
5.4.4 Dynamic feed-in limiter
With the Dynamic feed-in limiter the output of the system can
be adjusted. You can:
•
Limit the output of the system.
•
Limit the output to the grid after the point where the load
is connected to the grid.
Summary of Contents for PowerRouter PR50SB-PR/S24
Page 1: ...Installation Manual PowerRouter Solar Battery Back up Stand alone Date 181213...
Page 9: ...PowerRouter Back up Stand alone Installation Manual Illustrations 7 19 20 21 22...
Page 10: ...Illustrations PowerRouter Back up Stand alone Installation Manual 8 23 24...
Page 50: ...9 Technical specifications PowerRouter Back up Stand alone Installation Manual 48 EN...
Page 51: ......