VOL.3-231
CHAPTER 2
TERMINAL-RELATED DEVICES
7.8 Loop-Back Test Execution Required/Not Required
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
START
Check lamp indications on the DLI/
DAI card
A
See if the lamp indications on the DLI/DAI card are as shown
below.
When the lamp indications are as shown above, perform the fol-
lowing loop-back tests.
•
Loop-back test from the DLI/DAI to the DRU/DAU.
•
Loop-back test between the DLI/DAI and the transmission
equipment.
CIRCUIT CARD
LAMP NAME
LAMP
INDICATION
PA-DAIA/
PA-DAIU
LINK (G)
ON
CRC (R)
OFF
PCM (R)
FRM (R)
MFRM (R)
RMT (R)
BLUE/AIS (R)
LB (R)
PA-DAIJ-A
LINK (G)
ON
CRC (R)
OFF
PCM (R)
FRM (R)
RMT (R)
BLUE (R)
LB (R)
Summary of Contents for SV8500
Page 1: ...Peripheral Equipment Description NWA 041680 001 ISSUE 12 0 FP85 110 S7 ...
Page 110: ...VOL 1 50 CHAPTER 1 DEVICES REQUIRED TO BUILD NETWORK Network Services List Box Example ...
Page 253: ...VOL 2 xiv TABLE OF CONTENTS CONTINUED Page ...
Page 292: ...VOL 2 39 Zone Transceiver ZT LEDs on the Zone Transceiver POWER STATUS Power lamp Status lamp ...
Page 1854: ...VOL 2 1601 MG SIP96 Port Settings tab opens Set the values as the following figure shows ...
Page 2721: ...VOL 3 234 CHAPTER 2 TERMINAL RELATED DEVICES Mounting of BATT BOX ASSEM Cover BATT BOX ASSEM ...
Page 3113: ...VOL 3 626 CHAPTER 4 CONFIGURATION SETUP b English Sm Lower case ...
Page 3114: ...VOL 3 627 CHAPTER 4 CONFIGURATION SETUP c Turkish Bg Upper case d Turkish Sm Lower case ...
Page 3115: ...VOL 3 628 CHAPTER 4 CONFIGURATION SETUP e Russian Bg Upper case f Russian Sm Lower case ...
Page 3118: ...VOL 3 631 CHAPTER 4 CONFIGURATION SETUP b English Sm Lower case ...
Page 3119: ...VOL 3 632 CHAPTER 4 CONFIGURATION SETUP c Turkish Bg Upper case d Turkish Sm Lower case ...
Page 3120: ...VOL 3 633 CHAPTER 4 CONFIGURATION SETUP e Russian Bg Upper case f Russian Sm Lower case ...
Page 3438: ...Printed in Japan 1307 120 ...