S
ECTION
3 SYSTEM SHUT DOWN
3.1 Powering Off the System
1.
Turn the all KSU(s) power off using the power switch.
Figure 3-16 Power Switch Location
• If Expansion KSU(s) are installed, turn the power on/off in the order of
Expansion 3 KSU, Expansion 2 KSU, Expansion 1 KSU and then Main
KSU.
• DO NOT power off by disconnecting the AC (or DC for battery backup)
power. Always use the Power Switch on the Main/Expansion KSU.
• All calls in progress will be cut off when the system is powered off, and if
the Power Failure is set, the applicable extension will become
operational.
• All user's setting (such as Call Forward, Camp-On, etc) will be kept.
3.2 Resetting the System
The system reset is carried out using the "Power OFF and ON" operation.
ISSUE 3.0
SL1000
Hardware Manual
3-7
Summary of Contents for SL1000
Page 1: ...Hardware Manual A50 031170 001 GE ISSUE 3 0 November 2012...
Page 12: ...MEMO SL1000 ISSUE 3 0 x Hardware Manual...
Page 16: ...MEMO SL1000 ISSUE 3 0 R 4 Regulatory...
Page 126: ...MEMO SL1000 ISSUE 3 0 3 8 System Start Up...
Page 140: ...MEMO SL1000 ISSUE 3 0 4 14 Maintenance...