(English)
32
IMPORTANT:
・
The Switch Module works with the Blade Enclosure. The Switch
Module is powered on as soon as it is installed in the powered Blade
Enclosure. Therefore, make sure that the ports connected with the
Switch Module are only the ports of on-board LAN and NIC on the
CPU Blade. Then, install the Switch Module in the Blade Enclosure.
・
Do not hold the ejector to install the Switch Module in the Blade
Enclosure. Hold the Switch Module itself and insert it into the Switch
Module slot. Inserting the Switch Module with the ejector being held,
the ejector may be damaged or disengaged from the Switch Module.
It may cause the personal injury if the Switch Module drops.
NOTE:
・
The Switch Module does not have a POWER switch.
・
The STATUS LED goes on green after the period of about 10
seconds from installing the Switch Module in the powered Blade
Enclosure.
Removal Procedure
Refer to the Blade Enclosure User’s Guide for details.
1
Open the ejector of 1Gb Intelligent L2
Switch to unlock.
Blade Enclosure
2
Pull the ejector a little.
Ejector