
4-16 Configuring Your Server
Option
Parameter
Description
Your Setting
Power ON Delay
Time (Sec)
[20] - 255
Specify the power on delay time within
the range between 20 and 255
seconds. The specified time is valid
when "Power On" or "Last State" is
specified for AC LINK.
Platform Event
Filtering
Disabled
[Enabled]
Specify whether to enable or disable
the platform event filtering (PEF)
feature.
[ ]: Factory-set
IMPORTANT:
To power on the server from the UPS (Uninterruptible
Power Supply), select [Server] - [AC LINK] - [Power On].
The table below shows the operation when the AC power to the server is turn off once and then on
again, depending on the setting of "AC LINK."
Setting of AC LINK
System status before AC power off
Stay Off
Last State
Power On
Operating
Off
On
On
Aborting (DC power being off also)
Off
Off
On
Forced shutdown
Off
Off
On
* Press the power switch continuously for four seconds or longer. This forcibly turns off the power.
Summary of Contents for Express5800/T120a-E N8100-1531F
Page 56: ...2 26 General Description This page is intentionally left blank ...
Page 70: ...3 14 Setting Up Your Server This page is intentionally left blank ...
Page 125: ...Configuring Your Server 4 55 Property of Physical Device of Universal RAID Utility ...
Page 178: ...4 108 Configuring Your Server This page is intentionally left blank ...
Page 276: ...6 26 Installing and Using Utilities This page is intentionally left blank ...
Page 290: ...7 14 Maintenance This page is intentionally left blank ...
Page 416: ...9 70 Upgrading Your Server This page is intentionally left blank ...
Page 428: ...A 4 Specifications This page is intentionally left blank ...
Page 436: ...C 2 IRQ This page is intentionally left blank ...
Page 475: ...Installing Windows Server 2008 D 39 4 Activate Windows The Windows activation is complete ...
Page 538: ...G 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 542: ...H 4 Product Configuration Record Table This page is intentionally left blank ...