background image

2-Bag Bagwell Module (Medium Gray)

19

Installing the modular 2-Bag Bagwell to a 7360 Core Cabinet

To install the modular 2-Bag Bagwell to the Core Cabinet of an NCR FastLane
SelfServ™ Checkout (7360) unit, follow these steps:

Note:

The procedure uses the Right-hand (RH) orientation for reference.

1. Align the holes on the End Panel of the Bagwell with the four (4) holes to the side of

the Core Cabinet.

2. Move the beside the Core Cabinet.

3. When necessary, adjust the leveling feet to prevent the Bagwell from wobbling.

Ensure that it does not wobble or rock by placing hands and exerting moderate
pressure on various parts of the Bagwell.

Summary of Contents for 7358-K702

Page 1: ...Kit Instructions 2 Bag Bagwell Module Medium Gray 7358 K702 Issue C...

Page 2: ...modifications or copies of this NCR copyrighted documentation is permitted under the terms and conditions of an agreement you have with NCR NCR s copyright notice must be included It is the policy of...

Page 3: ...Mar 2021 First Issue B May 2021 Updated illustration and part numbers in the Kit Contents section Updated procedures Added procedures for NCR FastLane SelfServ Checkout 7370 C Aug 2022 Added procedure...

Page 4: ...iv...

Page 5: ...arge Basket Module can be configured for either Left hand LH orientation or Right hand RH orientation which refers to the direction customers scan and bag items Left hand LH orientation Customers scan...

Page 6: ...2 2 Bag Bagwell Module Medium Gray Kit Contents Part Number Description 497 0530819 Large Basket 2 Bag Module Kit WM Medium Gray 006 8627877 Push In Rivet 0 25 Black 6 pcs...

Page 7: ...Plastic Knob Red M6X1Mm X 15Mm Steel Stud 4 pcs 497 0528562 Large Basket 2 Bag Fence 497 0528631 Goods Shelf 2 Bag Top 497 0530517 Hole Plug 1 000 WM Medium Gray 2 pcs 497 0530518 Hole Plug 2 000 WM M...

Page 8: ...approximate shipping dimension and weight of the 7358 K702 2 Bag Bagwell Module Medium Gray Note These values are for reference only Shipping Dimension Shipping Weight Height Length Width Pounds lbs...

Page 9: ...ws the approximate dimension and weight of the 7358 K702 2 Bag Bagwell Module Medium Gray Note These values are for reference only Module Dimension Module Weight Height Length Width Pounds lbs Kilogra...

Page 10: ...Required Tools The 7358 K702 2 Bag Bagwell Module Medium Gray is designed to be assembled without tools But if a push in rivet needs to be removed NCR recommends using any of the following tools wire...

Page 11: ...gwell to the SelfServ Checkout unit Depending on the unit refer to either of the following procedures Installing the modular 2 Bag Bagwell to a 7358 Core Cabinet on page 14 Installing the modular 2 Ba...

Page 12: ...the assembly to the Core Cabinet Door Note The procedure uses the Right hand RH orientation for reference 1 Lay the U Module on its side as shown in the image below 2 Attach the End Panel by doing the...

Page 13: ...2 Bag Bagwell Module Medium Gray 9 b Slide the hooks into the U Module slots to engage the hooks Ensure that the End Panel snaps in place c Verify that all hooks are properly engaged...

Page 14: ...gether using two 2 push in rivets 3 Attach the U Module to the U Module assembly by doing the following a Align the hooks with the slots two on each side of the Center Panel assembly and then slide do...

Page 15: ...sing using two 2 push in rivets 4 Attach the End Panel to the U Module assembly by doing the following a Align the hooks with the slots two on each side of the U Module assembly and then slide down to...

Page 16: ...12 2 Bag Bagwell Module Medium Gray b Fasten the End Panel and U Module together using two 2 push in rivets...

Page 17: ...more information refer to Setting up the modular 2 Bag Bagwell on page 8 2 Install the modular 2 Bag Bagwell assembly For more information refer to Installing the modular 2 Bag Bagwell to a 7358 Core...

Page 18: ...teps Note The procedure uses the Right hand RH orientation for reference 1 Align the holes on the End Panel of the Bagwell with the four 4 holes to the side of the Core Cabinet 2 Move the beside the C...

Page 19: ...2 Bag Bagwell Module Medium Gray 15 4 Secure the Bagwell using four 4 black knob screws...

Page 20: ...tation for reference 1 Assemble the modular 2 Bag Bagwell For more information refer to Setting up the modular 2 Bag Bagwell on page 8 2 Align the holes on the Bagwell with the two 2 holes on the side...

Page 21: ...2 Bag Bagwell Module Medium Gray 17 5 Secure the Bagwell using two 2 red knob screws 6 Install a hole plug in the area not covered by the Pedestal Cabinet as shown in the example below...

Page 22: ...ll the Bagwell Support Bracket by doing the the following a Attach the Bagwell Support Bracket using two 2 bolts on the underside of the Scanner Bucket and two 2 bolts on the Bagwell b Secure the two...

Page 23: ...steps Note The procedure uses the Right hand RH orientation for reference 1 Align the holes on the End Panel of the Bagwell with the four 4 holes to the side of the Core Cabinet 2 Move the beside the...

Page 24: ...20 2 Bag Bagwell Module Medium Gray 4 Secure the Bagwell using four 4 M6 red knob screws...

Page 25: ...nstall the Top Tray on the Bagwell follow these steps 1 Place the Top Tray on the Bagwell Ensure that the captive screws on both ends of the Top Tray are aligned with the corresponding screw holes on...

Page 26: ...age 25 Removing the modular 2 Bag Bagwell from a 7370 Pedestal Cabinet on page 27 Removing the modular 2 Bag Bagwell from a 7360 Core Cabinet on page 30 3 Install the Bagwell to the other side of the...

Page 27: ...the Top Tray from the Bagwell follow these steps Note The illustrations in this procedure shows an NCR FastLane SelfServ Checkout 7358 unit only as an example 1 Loosen the captive screws at each end o...

Page 28: ...he Bagwell fence follow these steps 1 Remove the Bagwell Top Tray For more information refer to Removing Modular 2 Bag Bagwell Top Tray on the previous page 2 Remove two 2 wing nuts that are securing...

Page 29: ...m the Core Cabinet of an NCR FastLane SelfServ Checkout 7358 follow these steps Note The procedure uses the Right hand RH orientation for reference 1 Remove the Top Tray For more information refer to...

Page 30: ...26 2 Bag Bagwell Module Medium Gray 3 Pull the Bagwell assembly away from the Core Cabinet as shown in the image below...

Page 31: ...of an NCR FastLane SelfServ Checkout 7370 follow these steps Note The procedure uses the Right hand RH orientation for reference 1 Remove the Top Tray For more information refer to Removing Modular 2...

Page 32: ...Bag Bagwell Module Medium Gray b Remove two 2 bolts from the underside of the Scanner Bucket and two 2 bolts from the Bagwell 3 Remove two 2 red knob screws to detach the Bagwell from the Pedestal Cab...

Page 33: ...2 Bag Bagwell Module Medium Gray 29 4 Pull the Bagwell assembly away from the Pedestal Cabinet as shown in the image below...

Page 34: ...lfServ Checkout 7360 unit follow these steps Note The procedure uses the Right hand RH orientation for reference 1 Remove the Top Tray For more information refer to Removing Modular 2 Bag Bagwell Top...