INSTALLATION DIAGRAMS:
1. Simple
Return water control with mechanical flow
via adjustable shunt.
You should also have some type of control
for the DHW
2. DHW w/ 2-way Hot Water
Priority Valve
Typically used when DHW is small or when
the surface coil is small.
Heat for the house is supplied while hot
water is being produced
A properly executed installation ensures that the system functions properly. Both national/local guidelines and requirements
must always be observed. The boiler can be installed on a pressurized system up to max 2.5 bar.
11
Summary of Contents for RTB PHOENIX v16.0
Page 1: ...NBE TR PILLESYSTE M RTB ready to burn UK V16 UK UK...
Page 28: ...Submenus can be found when accessing a main menu Select to retrieve parameter help text 28...
Page 33: ...33...
Page 35: ...WIRING DIAGRAM 35...
Page 44: ......