background image

8

THESE NUTS 

USED FOR 

LEVELING

Figure 2

2.  Assemble anchor system as follows: Thread nut 

(#35) to bottom of threads on anchor bolt (#F) insert 

threads of anchor bolt (#F) through hole on anchor 

plate (#8) and secure with nut (F#35). Repeat this 

step for the remaining anchor bolts. See Figure2

Note: Each anchor bolts should face the anchor bolt like 

the right Figures. See Detail A

Note: It is recommended that you use some sort of concrete form for the top 4" of the concrete. 

Cardboard forms can be purchased at some hardware and home stores or a wooden form can 

be constructed out of 2 x 4's.

3.  Mix and pour concrete into hole. Follow instructions on concrete bag. Stop about 18" below 

court level.

4.  Insert four reinforcement bars (#K) into concrete 8" apart creating a square in center on 

hole.

5.  Finish pouring concrete up to court level.

6.  Push anchor system into concrete and agitate to work out voids in concrete. Immediately 

use a level to level and square anchor plate to playing surface. Clean off any concrete that 

may be on exposed threads.

Note: The bottom four nuts will be forever embedded in concrete. The top four nuts remain on 

bolts and are used for leveling.

Let concrete stand for a MINIMUM of 72 hours.

Summary of Contents for UGO-20433WM

Page 1: ...UGO 20285WM Save these instructions for future reference For assistance PLEASE CONTACT WAL MART STORES INC USA at 833 971 0570 WARNING READ AND UNDERSTAND OPERATOR S MANUAL BEFORE USING THIS UNIT FAIL...

Page 2: ...3 Check all poles for visible rust chips or cracked paint If either is present do the following a Use an emery cloth to completely remove any rust or chipped paint b Clean the area with a damp cloth a...

Page 3: ...is not installed main tained and operated properly SAFETY INSTRUCTIONS If using a ladder during assembly use extreme caution 4 Capable adults are recommended for this operation Before digging contact...

Page 4: ...instructions and warnings 7 Any modi cations made to the basketball goals 8 Commercial or competitive use The product is intended only for residential recreational use 9 Scratching scuf ng or fractur...

Page 5: ...not slide climb or play on base or pole When adjusting height or moving system keep hands and ngers away from moving parts Do not allow children to move or adjust system During play do not wear jewelr...

Page 6: ...Backboard 1PC 3 Rim 1PC 4 Net 1PC 5 Upper Arm 2PCS 6 Lower Arm 2PCS 7 Anchor Plate 1PC 8 Actuator 1PC 9 Actuator Crank Pre Installed 1PC 10 U shape Post 1PC 11 Post Washer 2PCS 12 Top Pole Cover Pre I...

Page 7: ...lts Washers and Nuts 1PC L M8x30mm Bolt Washer and Nut Pre Installed 1PC M Crank bearing Pre Installed 1PC N Do you have questions Are you missing any parts DO NOT RETURN TO STORE Call toll free custo...

Page 8: ...1 15 16 socket and ratchet optional 1 concrete form see note after step 2 1 Wheel barrow 1 Garden hose 1 Level 1 Tape measure Note For best results with less vibration anchor system should be indepen...

Page 9: ...ome hardware and home stores or a wooden form can be constructed out of 2 x 4 s 3 Mix and pour concrete into hole Follow instructions on concrete bag Stop about 18 below court level 4 Insert four rein...

Page 10: ...Pole 2 with the bottom pole 1 as shown in Figure 3 and slide them together ASSEMBLY INSTRUCTIONS Day 5 NOTE All board arms are made of rectangular tubing Tightening hardware too tight may damage tubi...

Page 11: ...as shown in Figure 4 secure using one Screw set A and two Screw sets B See Figure 3 Tighten bolts tight Note Stand poles up on a block of wood lift poles up and hit on a block of wood until the holes...

Page 12: ...bolts snug but do not over tighten Board Arms must pivot freely The last bolt L used as a stop bolt through this stop bolt into the middle hole and tight this bolt as below Note All board arms are mad...

Page 13: ...he Lower Arm 7 a Stop Spacer E the Actuator 9 the other Stop Spacer E the other Lower Arm 7 the washer and the lock nut in order See Figure 6 Note Don t tighten bolt D at this time Attach Actuator Cra...

Page 14: ...sing two bolts O two washers and two lock nuts for upper two holes two bolts G two washers and two lock nuts for lower two holes Place a level across rim assembly and adjust rim until it is level Fini...

Page 15: ...Plate on backboard using two bolts C two wash ers and two lock nuts See Figure 10 And then have the fourth attach Upper Arms 6 to Upper mounting Plate on backboard using two bolts C two washers and tw...

Page 16: ...cure with one atwasher 37 one lock washer 36 and one hex lock nut 34 for each anchor bolt Tighten Fasteners nger tight leave loose enough to level pole Place a level on pole and adjust bottom nuts 35...

Page 17: ...100 Cotton soft cloth and glass cleaner Clean glass as you would household windows Strong cleansers will damage backboard and void warranty RIM HANGING ON THE RIM WILL VOID YOUR WARRANTY Rims are not...

Page 18: ...17 Warning Four adults required for assembly...

Page 19: ...18 Warning Four adults required for assembly Complete View...