Navim Group Company EsiWelma Sensigas UR.21.P Manual Download Page 6

 

EW146691_en - rev. A 

Gas Detectors 

 UR.21.P 

02/04/2020 

Gas detection systems for car parks and tunnels 

6/8

 

 

Mechanical  installation  of 
the optional Relay Card  or 
optional  PhotoMos  Cards 
with 

resistive 

output 

variation 

On  the  main  electronic  card  it  is  possible  to  insert,  in  a  special  connector  named 

CN1

,  a 

module  having  on  board  N.  4  relays  with  changeover  contact  that  will  be  activated  in 
correspondence  of  the  pre-alarm  events,  1

st

  alarm  threshold,  2

nd

  alarm  threshold and  faulty 

sensor, and the relative LEDs signaling. 
Follow the steps below to insert the card: 
 
 

Phase 1: 

Insert  on  the  main  electronic  card  the 
card guide supplied with the card, taking 
care  to  turn  the  elastic  flag  towards  the 
main terminal board. 
Locate the connector CN1. 
 
 

 
 
 
 

 
 
 
 

 

 
Phase 2: 

Fully  insert  the  card,  taking 
care  to  pull  the  elastic  flag 
of  card  guide  towards  the 
terminal 

board 

of 

the 

optional card. 
 
 
 
 
 
 
 
 
 

 

 
 
 
 

Phese 3: 

Check the positioning of the card checking that all 
pins  are  internal  to  the  CN1  connector  and  that, 
by  practing  a  slight  pull  upwards,  the  card 
remains  in  position  due  to  correctly  hooked  and 
held by the elastic flag of the card guide. 
 
 
 

Phase 4: 

Mark  the  box  showing  the 
presence  of  the  relay  card 
inside  the  device  with  a 
permanent marker (example). 
 
 
 
 
 
 
 
 

 

 

 

Card Guide 
(with Elastic Flag) 

Elastic Flag 

CN1 Connector 

Summary of Contents for EsiWelma Sensigas UR.21.P

Page 1: ...ns Pre alarm 1st alarm threshold 2nd alarm threshold Sensor Failure Operation In case of a gas leak the detector compares the measured concentration value with the intervention thresholds set by activ...

Page 2: ...nded Range 20 70 Relative Umidity UR without condens Operating Storage 15 90 45 75 Operating Pressure KPa 80 120 Air Speed m s 6 Optical Signalling Red LED visible inside the housing Dimensions and We...

Page 3: ...he LOOP peripheral fire alarms that have a behavior similar to that of smoke detectors Verification and Calibration Kit TUS40 Service and Maintenance Terminal with Interface Board UIC20 Replacement Se...

Page 4: ...ent of the gas Far from appliances that throughout their normal working can have functional gas leakage unless this is the purpose of the detection In environments where atmospheric conditions are not...

Page 5: ...ve of the supply signal as the 4 20mA signal reference to change this setting it is necessary to move the triple jumpers J4 as shown in the figure Ref to default Ref to To set the 4 20mA output signal...

Page 6: ...ow to insert the card Phase 1 Insert on the main electronic card the card guide supplied with the card taking care to turn the elastic flag towards the main terminal board Locate the connector CN1 Pha...

Page 7: ...l operating state however the best performance will be obtained after about 2 hours With the operating sensor it is necessary to verify its response using the specific TUL40 test kit consisting of 1 c...

Page 8: ...it to EsiWelma Possible sensors non calibration found during the periodic checks can be identified and corrected with the help of the TUL40 test kit and the TUS40 service terminal or of the display bo...

Reviews: