About the Boiler 19
2.7 Installation Procedure
The flow diagram below provides a step-by-step description of the recommended procedure for clear, easy installation of the NCB700
boiler in its final location. A detailed description is given of the procedure in the sequenced sections below:
Wall-mounting
»
Gas connection
»
Electrical connections
»
Final check
»
Water and condensate
pipe connection
»
Flue gases exhaustion
system installation
(if necessary)
»
Gas changeover
(if necessary)
»
Boiler operation
»
p. 22
p. 25
p. 43
p. 55
p. 59
p. 60
p. 46
p. 85