8. With the help of another person, tilt the frame assembly to one side to provide adequate
clearance for installation of the leg levelers. You can place a block of wood or other such
support under the frame assembly for stabilization. Insert the leg levelers into the front and
rear support tubes as shown in Figure 1. The R10 also requires a leg leveler in the center
frame tube.
9. Adjust the leg levelers so that they contact the floor with approximately the same number of
threads showing. In some case, one or two of the leg levelers may have less, or more, threads
showing depending on the levelness of the floor. Secure the jam nut against the support tube
to lock the leg leveler in place.
Figure 1
10. Place the mast assembly near the mast mounting plate on the frame assembly. Connect
the attached black wire tie to the main harness (20-pin connector), CHR harness (4-pin
connector), and TV coaxial cable. Carefully pull on the wire tie to draw the harnesses and cable
through the mast assembly. Pull the excess harness and cable out of the access hole.
11. Position the mast assembly against the mast mounting plate so that the holes are aligned.
Secure the mast assembly to the mast mounting plate using the (4) 3/8-16 hex head screws.
Take care not to pinch the harnesses and cable. Use the 5/16 allen wrench to tighten.
assembly questions? call 800-235-2233 for help.
14