To connect the station reference ground, perform the following steps:
1.
Locate the station reference ground stud at the bottom left of the transmitter cabinet, as viewed
from the rear.
2.
Remove the outer (exterior) nut and re-assemble as shown in
. Attach a
continuous, low impedance conductor (minimum four-inch copper strap, or equivalent wire)
between the site’s station reference ground and the transmitter’s station reference ground stud.
Ensure the reference ground conductor is at least 3 mm (1/8 in) from the cabinet’s exterior.
3.
Verify it is still possible to open the rear door of the transmitter with the reference ground
conductor connected. If you use a copper strap for the conductor, you may need to trim its width
slightly near the door.
4.
For information about grounding the lightning protection, see the
NX5/NX3 Pre-Installation
Manual.
For detailed information about lightning protection, see the
Nautel Recommendations for
Transmitter Site Preparation Manual
, available on the Nautel website or from your Nautel sales
agent.
5.
Firmly tighten all hardware.
Summary of Contents for NX3
Page 2: ......
Page 4: ......
Page 8: ...NX5 NX3 INSTALLATION MANUAL PAGE 2 VIII VERSION 3 1 2021 04 22...
Page 32: ...NX5 NX3 INSTALLATION MANUAL ADJUSTING THE SPARK GAP PAGE 2 5 4 VERSION 3 1 2021 04 22...
Page 54: ...NX5 NX3 INSTALLATION MANUAL COMMISSIONING TASKS PAGE 2 8 12 VERSION 3 1 2021 04 22...
Page 58: ...NX5 NX3 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 9 4 VERSION 3 1 2021 04 22...
Page 69: ......