Inspecting Lightning Protection Systems
You should inspect the lightning protection systems that are connected to your GV5/GV3.5 transmitter,
ac power, RF feedline, antenna and tower periodically to ensure that your site, equipment and
personnel are fully protected.
Interval
Every 6 months.
Parts and Tools
Depends on your site, but may include a digital multimeter, ladder, binoculars, and continuity tester.
Procedure
Perform the following steps to test the lightning protection systems:
1.
Test the continuity between ground available at your lightning arrestor and ground available on
various pieces of equipment connected to the transmitter. Ensure that there is no resistance (near 0
ohms, accounting for multimeter test lead resistance).
2.
Physically inspect the lightning arrestor to ensure that all connections are tight. Also look for any
sign of scoring or burning (indications of possible damage from earlier lightning strikes).
3.
Using binoculars, visually inspect the hardware on the tower. Look for charred, broken or frayed
connections and corrosion.
Summary of Contents for GV5
Page 2: ......
Page 4: ......
Page 8: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL PAGE 3 VIII VERSION 0 2 2014 07 23...
Page 16: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL DESCRIPTION PAGE 3 1 8 VERSION 0 2 2014 07 23...
Page 18: ...VERSION 0 2 2014 07 23 PAGE 3 1 10 LJXUH 9 9 XGLR 3DWK ORFN LDJUDP...
Page 239: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL ROUTINE MAINTENANCE PAGE 3 3 10 VERSION 0 2 2014 07 23...
Page 249: ...GV5 GV3 5 OPERATIONS MAINTENANCE MANUAL LIST OF TERMS PAGE 3 5 2 VERSION 0 2 2014 07 23...
Page 250: ......