background image

NOTES

COMPONENTS

1.

POSITION FORT AS PER THE LAYOUT PLANS.

PAVER FOOTING

2.

INSTALL POSTS ON 450 x 450 x 80mm [18" x 18" x 3"] MIN.
SIZE PRECAST CONCRETE PAVERS.

3.

PAVERS ARE TO BE PLACED ON 150mm [6"] MIN. DEPTH
OF CRUSHED GRAVEL (OR 

3

4

" CLEAR GRAVEL)

COMPACTED TO 98

S.P.D.D.

3.a.

ENSURE THE GRANULAR BASE COURSE EXTENDS MIN.
150mm [6"] BEYOND THE EDGE OF THE PAVERS.

ASSEMBLY

4.

ASSEMBLY IS A 2-4 PERSON JOB.

5.

ALL POSTS ARE THE SAME LENGTH.

6.

DETERMINE WHICH POSTS ARE THE REAR POSTS BY
LOCATING THE RAILING HOLES ON THE POSTS.

6.a.

THE REAR POSTS HAVE 4 RAILING HOLES, 2 FOR THE
SIDE RAILS AND TWO FOR THE REAR RAILS.

6.b.

THE FRONT POSTS HAVE 2 RAILING HOLES FOR THE
SIDE RAILS.

7.

STAND UP THE FRONT AND BACK POST FROM ONE SIDE,
ENSURE RAILING HOLES ARE POINTING IN THE CORRECT
DIRECTION.

8.

LOCATE THE RAILINGS.

9.

INSTALL THE VERTICAL RAILING BAR AND FASTEN WITH
STRUCTURAL SCREWS INTO THE TOP AND BOTTOM
RAILING FOR THAT SIDE.

10.

INSTALL THE COMBINED RAILING INTO THE HOLES IN THE
POSTS.

11.

FASTEN RAILINGS USING STRUCTURAL SCREWS.

12.

REPEAT THE ABOVE RAILING STEPS FOR THE OTHER

TWO SIDES.

13.

LOCATE THE BEAM THAT GOES ON TOP OF THESE
POSTS.

14. PLACE THE BEAM ON TOP OF THE POSTS BY FITTING

THE DOWELS INTO THE PRE-DRILLED HOLES.

15. REPEAT STEP 6 FOR THE OPPOSITE SIDE.

16.

LOCATE THE BEAM THAT GOES LEFT TO RIGHT FOR THE
REAR AND FRONT.

17.

FIT THE BEAM BETWEEN THE TWO FRONT POSTS AND
THE TWO REAR POSTS.

18.

AT THIS POINT A SQUARE SHOULD BE COMPLETED ON
TOP OF THE POSTS.

19.

ENSURE THAT THE POSTS ARE CORRECTLY POSITIONED
ON THE PAVER FOOTINGS.

20. FASTEN THE BEAMS TOGETHER USING SUPPLIED

STRUCTURAL SCREWS IN PRE-DRILLED HOLES.

21.

LOCATE THE VERTICAL KING PIN.

22. PLACE THE KING PIN IN THE CARVED SECTION IN THE

CENTRE OF THE FRONT AND BACK BEAM.

23. ENSURE THAT THE CORRECT KING PIN IS ON THE

CORRECT BEAM -THE TOPS OF THE KING PIN SHOULD BE

LEVEL TO EACH OTHER.

24. LOCATE THE RIDGE BEAM.
25. PLACE THE RIDGE BEAM ON TOP OF THE KING PIN

ALIGNING THE DOWELS WITH THE HOLES.

26. FASTEN THE KING PIN TO THE FRONT AND BACK BEAM

WITH STRUCTURAL SCREWS GOING FROM UNDER THE
BEAM UP INTO THE KING PIN.

27. FASTEN THE RIDGE BEAM TO THE KING PIN WITH

STRUCTURAL SCREWS GOING FROM THE TOP OF THE
RIDGE BEAM DOWN INTO THE KING PIN.

28. INSTALL ROOF PERLINGS BY SETTING THE FRONT AND

BACK PERLING FLUSH TO ENDS OF THE RIDGE BEAM.

29. INSTALL ADDITIONAL 4 PERLINGS PER SIDE EQUALLY

SPACED BETWEEN THE FRONT AND BACK PERLING

30. FASTEN THE PERLINGS TO THE BEAMS WITH

STRUCTURAL SCREWS -ONE PER BEAM.

31.

INSTALL ROOF BOARDS

32. START AT THE PEAK, MAKE THE TOP BOARD ON ONE SIDE

OVERLAP THE TOP BOARD ON THE OTHER SIDE TO
CREATE THE PEAK.

33. CONTINUE ADDING BOARDS UNTIL THE BOTTOM OF THE

PERLINGS. -BOARDS SHOULD END AT THE SAME
LOCATION ON BOTH SIDES.

34. INSTALL ROOF BOARDS WITH 3" GALVANIZED SPIRAL

NAILS.

LOG POST: x4
HORIZONTAL LOG RAILING: x6

VERTICAL LOG RAILING BAR: x6

LOG SIDE BEAM: x2

LOG FRONT/BACK BEAM: x2
LOG KING PIN: x2
LOG RIDGE BEAM: x1
LOG PERLING: x10

ROOF BOARDS
S.D.W.S. STRUCTURAL SCREWS
76mm [3"] GALVANIZED SPIRAL
NAILS

NATURE'S INSTRUMENTS NI-PG-801-01  1525 x 2133mm [5' X 7'] LOG FORT. NI PACKAGE INCLUDES:-

GRAVEL & 4 PAVING STONES ARE NOT SUPPLIED.

N.T.S.

N

s

INSTRUMENTS

FOR YOUR PLAYGROUND

DETAIL

PRODUCT NUMBER

PAGE

SCALE @ 8.5x11

DRAWN

CHECKED

PHONE NUMBER:

1-877-733-7459

NI-PG-

LOG FORT: 1525 x 2133mm [5' x 7'] SIZE

801-01

RI

SE

1 OF 3

Reviews: