©Ecoflo Wastewater Management Pty Ltd
IMNL-008.151121
Page 6
Go to the underfloor area and look for the hole you have drilled.
Check to see if there is a floor joist, water pipe or electrical wiring under
the area you are going to cut.
View from under floor
NOTE
: If there is a joist in the way, either reposition the waste hole OR install trimmer joists to each
end of the cut joist, and fix all connections with galvanised framing anchors with 4 nails each leg
(refer to diagram below).
3
4
Summary of Contents for CLASSIC 850
Page 22: ......