
©
National Instruments Corporation
7
SCXI-1313 Installation Guide
Figure 2.
SCXI-1313 Signal Connections
5.
Connect the signal wires to the screw terminals by inserting the
stripped end of the wire fully into the terminal. No bare wire should
extend past the screw terminal. Exposed wire increases the risk of short
circuits and equipment failure.
6.
Tighten the screws to a torque of 5–7 in.-lb.
7.
Connect the safety earth ground to the safety-ground lug. Refer to the
section for connection information.
8.
Reinstall the strain-relief bar and tighten the strain-relief screws.
9.
Reinstall the top cover and tighten the top cover screws.
10. Connect the terminal block to the module front connector as explained
in the
section.
1
Voltage Dividers
2
Product Name
3
Chassis Ground
4
Thermistor
5
Assembly Number and Revision Letter
6
Serial Number
7
Channel Labeling for SCXI-1123
8
Channel Labeling for SCXI-1125
9
Screw Terminals
10 Relays to Enable or Bypass the Attenuator
3
1
2
9
6
8
10
7
5
4
Summary of Contents for SCXI-1313
Page 14: ......