RM-26999 Calibration Procedure
© National Instruments Corporation
3
Password
NI
Note
This is the default password for all password-protected operations. This
password is site-specific.
Task
Estimated Test Time
Operator Connections
Test Points
Setup
5 minutes
8 connections
—
Warm Up
30 minutes
—
—
Verify, Adjust, and Reverify
35 minutes
28 connections
88 points
Verify only
15 minutes
8 connections
41 points
Adjust only
5 minutes
12 connections
6 points
Note
Estimated test times assume the user is conducting a manual calibration.
For most procedures, automating the calibration significantly reduces test
times.
Environmental Conditions for Calibration
Ambient temperature
23 °C ± 5 °C
Relative humidity
20% to 80%
Calibration Condition Guidelines
Keep cabling as short as possible. Long cables act as antennas, picking up extra
noise that can affect measurements.
Ensure that all connections to the DUT are secure.
Allow adequate warm up time for all components of the calibration system.