
test to determine successful device installation. When the self-test finishes, a message
indicates successful verification or if an error occurred. If an error occurs, refer to
11. Run a test panel in MAX by expanding
Devices and Interfaces
»
Network Devices
»
your
FieldDAQ device
, right-clicking the bank of connectors in your FieldDAQ device, and
selecting
Test Panels
. If the test panel displays an error message, refer to
.
Click
Close
to exit the test panel.
Note
When in use, the FieldDAQ device may become warm to the touch. This is
normal.
Note
M12 connectors must be mated to cables or have caps installed on them to
meet IP65/IP67 requirements. Cover the unused connectors with the included plastic
caps whenever water, dust, or dirt are present.
Note
Avoid long periods of exposure to sunlight.
For instructions on networking to a real-time controller, refer to
Power Connectors and Wiring
The FieldDAQ device has two 5-pin L-coded M12 power connectors, power IN and power
OUT. The power connectors provide one voltage line (V), one common line (C), chassis
ground, and two lines for optional auxiliary power, Aux1 and Aux2.
The following figure shows the power circuitry on the FieldDAQ device.
Figure 6. Power Circuitry
IN OUT
Chassis Ground
Internal Circuit
Aux
V
C
The FieldDAQ device requires an external power source connected between the V and C
terminals, as described in
Power Requirements
in the
FD-11634 Specifications
. The FieldDAQ
FD-11634 User Guide
|
© National Instruments
|
11