![National Crane 600H Service Manual Download Page 213](http://html1.mh-extra.com/html/national-crane/600h/600h_service-manual_3360637213.webp)
NATIONAL CRANE
08-19-2022 Control # 092-13
9-31
600H SERVICE
CRANE INSTALLATION
9
FIGURE 9-13
Jack Tube Weldments
1.19
Min
Bar 203321
18.19
Jack Tube
Outrigger Box
16.25” on 43” Tall Truck Frame.
NOTE:
All welds are grade 70 or better.
With complete crane installed on the truck, position the vertical to
1.19” dimension as shown. If more ground penetration is needed,
rotate bar 203321
12 ref” on 43” Tall Frame.
GROUND
16.25” on 43” Tall Truck Frame.
16.25” on 43” Tall Truck Frame.
REFERENCE ONLY
Summary of Contents for 600H
Page 1: ...Service Manual National Crane 600H R E F E R E N C E O N L Y...
Page 6: ...THIS PAGE BLANK R E F E R E N C E O N L Y...
Page 136: ...BOOM 600H SERVICE MANUAL 4 62 08 19 2022 Control 092 13 R E F E R E N C E O N L Y...
Page 231: ...R E F E R E N C E O N L Y...
Page 232: ...R E F E R E N C E O N L Y...