VHF Transceiver Manual
SM05 Rev 4.00
Nov 26, 2003
Page 1-6
ENG-FORM: 800-0107.DOT
CONFIDENTIAL AND PROPRIETARY TO NORTHERN AIRBORNE TECHNOLOGY LTD.
2.3.6
Post-Installation
Checks
2.3.6.1 Wiring
Checks
a)
With the Tac/Com control head disconnected from all of its mating connectors,
make the following measurements on P100 SYSTEM connector (25 pin female),
if used:
i)
Check pin 1 and 2 for +28 VDC (or 14 VDC) relative to ground.
ii)
Check pins 13, 14 and 15 for continuity to ground (below 0.5 ohms).
iii)
Check pin 3 (28 VDC), pin 4 (14 VDC) or pin 5 (5 VDC) for proper lamp
dimmer voltage. Check 16, 17 or 18 for continuity to ground as above
(lamp
return).
DO NOT ATTACH THE TAC/COM CONTROL HEAD until these conditions are met.
b)
With the Tac/Com Transceiver disconnected from all of its mating connectors,
make the following measurements on the airframe (female cable end) connector:
i)
Check pin 1 and 2 for +28VDC relative to ground.
ii)
Check pins 14 and 15 for continuity to ground (below 0.1 ohms).
iii)
Check pin 6 for PTT action (closure to ground when keyed), and pin 5 for
mic connection. Note that these are commonly reversed by accident, and
will result in transceiver keying, but no modulation.
iv)
Check pins 11 and 24 for continuity to the ship's audio system as required
for RX audio.
d)
ENSURE that neither pin 12 or 25 is connected to ground, or immediate failure of
the radio will result. This (optional) speaker line is a bridge output, and must be
floating above the airframe ground.
e)
Ring out the channeling lines to the control head connector, and check for shorts
on all shielded cables. Note that a quick check of these lines will save many
wasted hours later, and possible control head and R/T damage.
f)
Check the RF connector for continuity to the antenna, and open circuit to ground
from the center conductor.
Summary of Contents for NT030
Page 2: ......
Page 4: ......
Page 6: ......
Page 20: ......
Page 21: ...Confidential and Proprietary to NAT ...
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ...Confidential and Proprietary to NAT ...
Page 28: ......
Page 29: ...Confidential and Proprietary to NAT ...
Page 30: ......
Page 31: ...Confidential and Proprietary to NAT ...
Page 32: ......
Page 33: ...Confidential and Proprietary to NAT ...
Page 34: ......
Page 35: ...Confidential and Proprietary to NAT ...
Page 36: ......
Page 37: ...Confidential and Proprietary to NAT ...
Page 38: ......
Page 39: ...Confidential and Proprietary to NAT ...
Page 40: ......
Page 41: ...Confidential and Proprietary to NAT ...
Page 42: ......
Page 43: ...Confidential and Proprietary to NAT ...
Page 44: ......
Page 45: ...Confidential and Proprietary to NAT ...
Page 46: ......
Page 47: ...Confidential and Proprietary to NAT ...
Page 48: ......
Page 49: ...Confidential and Proprietary to NAT ...
Page 50: ......
Page 51: ...Confidential and Proprietary to NAT ...
Page 52: ......
Page 53: ...Confidential and Proprietary to NAT ...
Page 54: ......
Page 56: ......