
10
StarLink
™
SLE Commercial LTEVI & LTEAI Series Dual-Path Alarm Communicators -- Installation Instructions
Wiring Diagram for Generic FACPs
with TELCO RJ Sockets
F A C P P C B O A R D
(CONTROL PANEL HOUSING)
Refer to section "
SUPPLYING POWER
".
TELCO RJ SOCKET (SECONDARY)
Optional:
When Power Supply
SLE-ULPS-R is not used, connect
FACP Aux Power or Listed power
supply (+12V or +24V) to StarLink
terminals 1 and 2 (observing
polarity)
(
+
) (
‒
)
+12V or +24V
AUX PWR
(STARLINK RADIO HOUSING)
StarLink Radio Terminals
PC Board: All connections are power limited except AC Mains and battery terminals.
LOCAL
DOWNLOAD
TELCO
SECONDARY
TELCO
PRIMARY
ETHERNET
1
(+)
2
(
‒
)
POWER PGM3
IN1
IN2
IN3
3
(
‒
)
4
(+)
5
(+)
6
(
‒
)
8
(
‒
)
7
(+)
9
(+)
10
(
‒
)
12
(
‒
)
11
(
+
)
13
EGND
19
N/O
21
N/C
20
C
IN4
IN5
OUT1
22 N/
C
24 N/
O
23 C
OU
T2
Power Supply (SLE-ULPS-R)
Either the
TRF12/
T123 (16.5V /
20VA) transformer
or the chassis-
mounted 16.5VAC /
20VA transformer
Optional; if not used, connect 10K
resistor between terminals 9 and
10 (IN4)
StarLink
BATTERY
(+)
RED
(–)
BLACK
8
9
10
N/C
COM
N/O
J2
Note: Battery
leads are not
power limited
10k
Ω
10k
Ω
10k
Ω
TELCO RJ SOCKET (PRIMARY)
EOLR
(
J2
jumper off)
(This connection only used with
Power Supply SLE-ULPS-R)
The feature "
Tip/Ring
Wiring Fault Report
" is
required for supervision.
Requires all 8 wires in
the RJ-45 cable
JP1
Shunt
JP1
on
bottom 2 pins
when using the
SLE-ULPS-R
Shunt on top 2
pins when NOT
using the
SLE-
ULPS-R
(These connections
only used without
Power Supply)
EOLR
JP2
Remove shunt
on
JP2
to enable
TELCO 2 trouble
*
Not required if
JP2
shunt is removed and FACP monitors TELCO 2.
To FACP Zone
Dedicated to Radio
Trouble
*
When using
JP2
option (monitoring Telco 2) with power supply wire:
1. Move Power Supply
IN1
from Radio
OUT1
terminal 21 to power
supply terminal 4 (-).
2. Do not wire power supply trouble relay to FACP zone.
3. Wire power supply terminal in series with 10K EOLR to Radio
IN4
(+).
4. Program
IN4
to report power supply trouble.