14
StarLink
™
SLE-LTEVI-FIRE & SLE-LTEAI-FIRE Commercial Series Dual-Path Alarm Communicators -- Installation Instructions
This page intentionally left blank.
Page 1: ...icators are for use as the primary means of communication with the central station and do not have backup mode capability Dual Path Communicators can also be utilized as a Sole Path Cell Communicator...
Page 2: ...acts TB6 IN 2 See TB5 above TB7 IN 3 Fire Alarm input Wire to FACP Fire Alarm relay N O with parallel 10K EOLR at FACP TB8 IN 3 See TB5 and TB7 above Secondary Telephone RJ 45 socket for FACP DACT con...
Page 3: ...is blinking in any other manner please contact technical support GREEN IP NETWORK CONNECTION LED Labeled D14 or DS14 this LED is located to the right of the ETHERNET socket on the PC board Operation i...
Page 4: ...ed at the lower right corner of the PC board The radio tower signal strength may fluctuate from day to day therefore it is best to try to find a mounting location where the LED pro vides a minimum of...
Page 5: ...AT THE NOC NOC Originated Alarms Contact ID Event Data Sent Pulse Format Event Code Sent Initiated By Comments Supervisory Fail E356 A00 Zn000 99 Automatically by NOC if fail to receive any signal fr...
Page 6: ...ext regular supervision transmission will occur at the interval deter mined by your rate plan Configuration Download Firmware Updates Technician on site required For Commercial Installations a technic...
Page 7: ...olor shall be used 6 Underwriters Laboratories Inc s listing requirements and limitations shall be complied with on site during any reprogramming of the radio or control panel and must perform re perf...
Page 8: ...connections are power limited except AC Mains and battery terminals JP1 Shunt JP1 on top 2 pins Optional Use 12 or 24VDC Listed regulated power supply Note Common radio ground and FACP ground GREEN RE...
Page 9: ...io STARLINK RADIO HOUSING StarLink Radio Terminals PC Board All connections are power limited except AC Mains and battery terminals Optional Use 12 or 24VDC Listed regulated power supply Note Common r...
Page 10: ...ry terminals JP1 Shunt JP1 on top 2 pins Wiring Diagram for FACP Relay Trigger Input Reporting Refer to section SUPPLYING POWER NC NORMALLY ENERGIZED FIRE TROUBLE RELAY C NO 10k Aux Power Regulated 12...
Page 11: ...d and FACP monitors TELCO 2 Program only TELCO 1 supervision Note Connect IN2 to a panel output used for identifying Telco line cut this is the DACT interconnect wiring to the radio PC Board All conne...
Page 12: ...12 StarLink SLE LTEVI FIRE SLE LTEAI FIRE Commercial Series Dual Path Alarm Communicators Installation Instructions This page intentionally left blank...
Page 13: ...StarLink SLE LTEVI FIRE SLE LTEAI FIRE Commercial Series Dual Path Alarm Communicators Installation Instructions 13 Housing Template 1 1 Scale Three Gang Mounting Double Gang...
Page 14: ...14 StarLink SLE LTEVI FIRE SLE LTEAI FIRE Commercial Series Dual Path Alarm Communicators Installation Instructions This page intentionally left blank...
Page 15: ...and firmly secure the conductors to the pigtail using an ap propriate wire nut or crimp connector for the num ber and gauge of conductors used IMPORTANT WIRING METHODS Incorrect Correct Use pigtail a...
Page 16: ...ncelled NAPCO neither assumes nor authorizes any other person purporting to act on its behalf to modify to change or to assume for it any other warranty or liability concerning its products In no even...