background image

NAPCO9600 / Basic Knowledge & Operation

19

Maintenance

Basic Maintenance:

1. There should be someone specially be in charge of operation and maintenance, it can’t be operated or

moved without permission

2. There should be none disturb during testing, for example: generator, motor, electric welding

3. It’s suggested to work with UPS(power stabilizer)

4. Keep it clean and dry

5. Please do not place the machine in the dusty room to avoid pollution

.

6. Don’t put it in the room too hot or polluted;
7. Don’t put it in the room where the temperature is too low

8. Don’t open or fix the machine without our assistance

9. Be careful during operation and moving

10. After testing, please close the cover to avoid dust

Remarks:

a)

Warm up Instrument.

Warm up for 10 minutes to make sure all the hardware at the right condition.

b)

Initialization with silver sample

Please do initialization with the silver sample. After initialization, the channel value should be around
1100+/-3.

c)

Sample should be on the right position

Place the sample to touch the test film and find the right position according to the front video.

d)

Select the proper template according to the sample

For different samples, we need select different template. (Remark: If the template is wrong, the testing
result should be wrong.)

e)

Coated Sample

Cut off the coating before testing. Otherwise the result will be not correct.

f)

Average result

Never judge the sample result according to one-time test, test 3-5 times, and then calculate the average
result

Summary of Contents for NAP9600

Page 1: ...User Manual NAP9600 X Ray Fluorescence Spectrometer...

Page 2: ...NAPCO9600 Basic Knowledge Operation 2 A A 1 Introduction Working Principle NAPCO9600 Basic Knowledge...

Page 3: ...NAPCO9600 Basic Knowledge Operation 3 Working Principle...

Page 4: ...s List B 2 Power Cables USB Port B 2 Turn on Instrument B 3 Turn on Computer B 4 Software Operation System PC Hardware Software Installation Software Introduction a Interface b Function B 5 Testing B...

Page 5: ...5 Accessories List Item QTY Remarks Power Supply cable 1 For turning on instrument and computer Silver sample 1 For initialization Test Film 10 Placing sample on it User Manual 1 For operator referen...

Page 6: ...strument Press the POWER button to turn on the instrument Turn on Computer Press the button to turn on the computer Caution Before switching off the instrument turn off the computer from the Windows f...

Page 7: ...ing system Operation system Win 7 PC hardware Advice configures CPU 1 60GHz Memory RAM 2 00GB Hard disk 60 GB System type 32 bit Operating System Pen and Touch Touch Input Available Software installat...

Page 8: ...heating After the system self test finished the instrument will be preheated for 5 minutes If the user opens the testing chamber cover the preheating will be automatically ended Recommend to finish th...

Page 9: ...nd calculating Spectrum name The name of spectrum which is testing or opening Test Voltage Real time voltage output to X ray tube from HV Test current Real time current output to X ray tube from HV Te...

Page 10: ...on peak E Current Peak Flag The feature line of element which is qualitatively identified such as Ag Ka Ag represents the element Ka is one of the characteristic spectra of Ag elements F Result The sy...

Page 11: ...t accuracy and stability If the result has big deviation system will remind customers to carry out this operation because this operation must be implemented with silver sample so it must be manually o...

Page 12: ...icient convenient digital small keyboard to input the name and then click OK If same name exists system will ask you want to cover Click Yes to cover previous file Click No to input name c At the begi...

Page 13: ...NAPCO9600 Basic Knowledge Operation 13 e Click the print button at the right lower corner then choose different external or internal printer Test Report...

Page 14: ...ick OK Notice if input test frequency as 5 the total testing duration is 5 times more than single test duration b After testing system will automatically switch to the results page It will display the...

Page 15: ...NAPCO9600 Basic Knowledge Operation 15 Test Report...

Page 16: ...ti test input name and test frequency click OK b After testing one point system will remind user to continue the test with another point as below c After completing all five points system will automat...

Page 17: ...NAPCO9600 Basic Knowledge Operation 17 Test Report...

Page 18: ...a smooth surface if problem still exist please contact engineer Q Why the software run slowly A Please temporarily close other unrelated software at the same time close the instrument software and th...

Page 19: ...0 After testing please close the cover to avoid dust Remarks a Warm up Instrument Warm up for 10 minutes to make sure all the hardware at the right condition b Initialization with silver sample Please...

Reviews: