GT10/GT30
3.2 Setting the Basic Communication Area, GT10 and PLC
29
3.2
Setting the Basic Communication Area, GT10 and PLC
3.2.1
What is the Basic Communication Area?
Communication between the GT10 and PLC is carried out as shown below.
GT10
PLC
Internal PLC devices
Part reference / output device
For part functions
(free device specification)
Basic communication area
For screen switching settings and system
control
(word device / bit device: 3 words each)
Ongoing
Communication
As shown in the illustration, communication is carried out on an ongoing basis between
the GT10 and internal devices in the PLC. Internal PLC devices are divided into the
following two devices:
Basic communication area
This area is for system control, such as screen switching settings. PLC devices belong
to this area on a fixed basis, and communication is constantly being carried out.
Breakdown of the basic communication area
Word devices (DT, FL, etc.)
3 consecutive words
Bit devices (WR, etc.)
3 consecutive words
– Word devices ––– For reading devices handled in word units (3 consecutive words)
– Bit devices ––– For reading devices handled in bit units (3 consecutive words)
References and output devices for parts
These are devices that are used in parts functions, and can be freely specified by the
user. Communication is carried out on an ongoing basis only for those that are currently
displayed on the screen and pertain to devices currently in use.
With the GT10, before GTWIN screen creation tool is used to specify the devices for
parts functions, the “basic communication area” must be determined.
DT0 to DT2 and WR0 to WR2 are set as the default values for the basic communication
area, but the initial address can be changed using the following procedure.
CAUTION
The basic communication area should be used in the PLC ladder
program to control the GT main unit.
Settings in GTWIN
Select “Configuration” under “File” on the menu bar, and then select the sub–menu
called “GT Configuration”. This displays the dialog box for the GT10 Basic Setup, as
Summary of Contents for GT10
Page 9: ...Table of Contents GT10 GT30 viii...
Page 10: ...ix Part I GT10 GT30 Main Unit...
Page 23: ...Safety Precautions GT10 GT30 xxii...
Page 24: ...Chapter 1 Specifications...
Page 37: ...GT10 GT30 1 5 Dimensions 14...
Page 38: ...Chapter 2 Installation and Wiring...
Page 48: ...Chapter 3 Setup...
Page 63: ...GT10 GT30 3 4 Setting the Basic Communication Area GT30 and PLC 40...
Page 64: ...Chapter 4 Connecting and Communicating with the PLC...
Page 94: ...Chapter 5 GT10 Configuration Settings...
Page 115: ...GT10 GT30 5 3 Entering Configuration Settings from the GT10 92...
Page 116: ...Chapter 6 GT30 Configuration Settings...
Page 138: ...Chapter 7 How the Various Functions Are Used...
Page 149: ...GT10 GT30 7 3 GT30 Bit Device Functions 126...
Page 150: ...Chapter 8 Servicing and Maintenance...
Page 157: ...GT10 GT30 8 5 Replacing the Backlight GT30 Only 134...
Page 158: ...Chapter 9 Troubleshooting...
Page 170: ...147 Matsushita Electric Works Europe AG Part II Screen Creation Tool Terminal GTWIN...
Page 174: ...Chapter 10 Preparing GTWIN...
Page 187: ...GT10 GT30 10 4 Procedures for Using GTWIN 164...
Page 188: ...Appendix A Code Tables...
Page 191: ...GT10 GT30 A 2 ASCII Code Table 168...