Matsushita Electric Works Fire & Security Technology AB
MEW00442
Rev: -
Operating Instructions EBL512, V1.44.x
48
17
Commissioning an installation
Before you connect the power supply to a control unit, all other cable
connections should be made. Check once more that they are correct.
17.1
Single Control Unit
1.
Take away the rectifier fuse (F1) and a battery fuse (F2 or F3) on
the charger board 1557.
2.
Connect the batteries to the charger board 1557.
3.
Connect the rectifier to the mains (230 V AC).
4.
Replace the rectifier fuse (F1) and the battery fuse (F2 or F3) on
the charger board 1557.
5.
LED "Power on", on the control panel, indicate that the 24 V DC
power supply (rectifier and/or battery) is okay.
6.
An automatic reset/restart will now take place (see chapter "Reset
/ Restart", page 55.
7.
The site specific data (SSD) can now be downloaded, see chapter
"Programming (SSD download)", page 50.
17.2
Control Units in a TLON network
In a TLON network there are two or more control units connected. A
TLON connection board 1590
is required in each control unit.
When the 1590 board is on place and the cables connected
38
,
for each
control unit
, do as follows:
1.
Take away the rectifier fuse (F1) and a battery fuse (F2 or F3) on
the charger board 1557.
2.
Connect the batteries to the charger board 1557.
3.
Connect the rectifier to the mains (230 V AC).
4.
Replace the rectifier fuse (F1) and the battery fuse (F2 or F3) on
the charger board 1557.
5.
LED "Power on", on the control panel, indicate that the 24 V DC
power supply (rectifier and/or battery) is okay.
6.
An automatic reset/restart will now take place (see chapter "Reset
/ Restart", page 55.
When all control units are running (power supplied), the TLON
network programming (configuration) has to be done
before
the site
38
The TLON connection board is to be mounted on the main board 1556.
Cable connections are to be made on the connection board 1555 (T.B. P1).