START-UP REPORT
General information
Unit tag: _________________________________
Project: __________________________________
Technician: _______________________________
Mailing Address: ___________________________
Contractor: _______________________________
Email Address: _____________________________
Phone #: _________________________________
Manufacturer information
Model number: ____________________________
Serial number: _____________________________
Pre-Start Inspection check list
Unit casing:
Airflow switch:
Gas leak:
Gas vents (if applicable):
Combustion air opening:
Chimney:
Combustion air proving switch:
Verify control wiring wire gauge
Verify supply voltage main disconnect
Verify supply gas pressure
Notes: ____________________________________________________________________________________
__________________________________________________________________________________________
Blower Start-up
Check line voltage:
Supply fan RPM:
_______________ RPM
Check Blower rotation:
Motor nameplate amperage: _______________ Amps
Check for vibration:
Actual motor amperage:
_______________ Amps
Actual air flow delivered:
_______________ CFM
Heater Start-up
Gas pressure:
________
________ ________
________ ________ ________
STOP
LOW FIRE HIGH FIRE
STOP LOW FIRE HIGH FIRE
|___________________ INLET GAS PRESSURE _______________|
|____________ GAS PRESSURE AT THE MANIFOLD______|
Differential pressure:
________
________
Flame signal: ________
VDC
Low volume
High volume
Adjustment
Low limit stat (freezestat):
______ºF
Low limit delay:
______sec.