
1385, boul. Lionel-Boulet, Varennes, Québec J3X 1P7 Toll Free: 1 888 514-8007
•
Tel: 438 338-1101
•
Fax: 450 922-5900
www.nagasinnovation.com
30
of
35
Ensure that all safety controls are operational.
•
Check the high limit temperature switch.
•
Ensure that there are no gas leaks in the piping (fittings and valves).
•
Inspect all electric connections.
•
Ensure that the blower and motor are firmly anchored.
•
Inspect the flame detector and pilot ignitor electrode; change if
necessary.
•
Inspect the burner and clean the orifices if necessary.
•
IMPORTANT!
BEFORE START-UP AND AFTER 8 HOURS OF OPERATION
Check bearing alignment and lubrication.
Check bearing clamps.
Check alignment and tension of belts.
AFTER 24 HOURS OF OPERATION
Check tension of belts