Operational Testing
87
Operational Testing
Energized and ready to operate, let’s verify proper operation of the myPV ClearSky™
PLUS Interconnection..
Safety First!
This procedure is written to follow the conditions set by the prior section of this manual,
If you have not yet performed the Initial Energization, or have taken any actions that
altered the as-left conditions of the myPV ClearSky PLUS set forth at the completion of
the Initial Energization, we strongly recommend performing the Initial Energization
before proceeding.
The following steps will allow interconnection voltage to flow through the myPV
ClearSky, from the Utility side, through the internal MV VFI breakers, to the Solar side,
and to any electrically equipment that is in a CLOSED circuit condition.
Improper PPE, tools, and/or knowledge will result in staff being exposed to the
full interconnection voltage and could result in injury and/or death.
The following steps should only be conducted by authorized and qualified commission
staff.
Summary of Contents for ClearSky Plus
Page 21: ...Resources 21 ...
Page 22: ...Resources 22 ...
Page 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Page 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Page 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Page 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Page 56: ...Network Integration 56 ...
Page 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Page 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Page 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Page 102: ...Spare Parts 102 ...
Page 103: ...Spare Parts 103 ...