Receiving
37
Receiving
The myPV ClearSky™ PLUS Interconnection arrives ready to lift, position, and set.
Here is what you can expect to get prepared and avoid common mistakes.
Scheduling
Approximately two (2) weeks prior to any contracted shipment date, your Solar-Ops
Account Manager will contact the PO issuer to confirm delivery date, shipping address,
and receiving representative.
To change or verify shipping schedule and details please contact your Solar-Ops
Account Manager.
Arrival
The Customer is responsible for receiving and unloading of all equipment deliveries.
The myPV ClearSky PLUS will arrive to your shipping address location palletized, on an
open flat bed truck.
Whenever possible, your Solar-Ops Account Manager will share tracking information
and put the driver directly in contact with the receiving party for receiving coordination.
NOTE: See lifting instructions below… the pallet should only be used for lift
positioning, not for direct lifting of the device.
The equipment arrives with four (4) SS Strap Clamps… DO NOT DISCARD THE SS
STRAP CLAMPS.
The SS Strap Clamps are reused for permanent pad mounting.
Summary of Contents for ClearSky Plus
Page 21: ...Resources 21 ...
Page 22: ...Resources 22 ...
Page 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Page 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Page 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Page 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Page 56: ...Network Integration 56 ...
Page 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Page 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Page 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Page 102: ...Spare Parts 102 ...
Page 103: ...Spare Parts 103 ...