AC•THOR®i Assembly Instructions, Version 210326
20
15.Wiring diagrams
NOTE:
For installations in 240 V grids instead of 3kW loads 3.6kW
loads are allowed!
15.1.
AC•THOR®i
- Wiring the control side
Power Meter – connection via router
Establishing the automatic connection via router may take as much as a
minute!
Summary of Contents for AC-THOR i
Page 21: ...AC THOR i Assembly Instructions Version 210326 21 Power Meter connection without router ...
Page 23: ...AC THOR i Assembly Instructions Version 210326 23 Control by inverter or battery management ...
Page 24: ...AC THOR i Assembly Instructions Version 210326 24 Control by the energy management system ...
Page 27: ...AC THOR i Assembly Instructions Version 210326 27 Operating mode M3 Hot water 6 kW ...
Page 28: ...AC THOR i Assembly Instructions Version 210326 28 Operating mode M4 Hot water heat pump ...
Page 29: ...AC THOR i Assembly Instructions Version 210326 29 Operating mode M5 Hot water space heating ...
Page 30: ...AC THOR i Assembly Instructions Version 210326 30 Operating mode M6 space heating ...
Page 31: ...AC THOR i Assembly Instructions Version 210326 31 Connecting three phase heating elements ...