Before You Begin . . .
3-6
DAC960PG Installation Guide
DAC960PG Installation Checklist
____ 1. POWER-OFF all enclosure and system components.
____ 2
Prepare the host system according to its documentation.
____ 3. Determine the SCSI ID and termination requirements.
____ 4. Check the DAC960PG jumper settings (only pins 1 & 2 on JP12 should have
a jumper).
____ 5. Mount the controller into the system; connect the cables and terminators.
____ 6. Identify the capacities of each of the connected drives (<2 GB size?).
____ 7. Safety check the installation, then power-on the system.
____ 8. If necessary, run the BIOS Options (Alt-M) at the prompt to match BIOS disk
size setting to boot disk size geometry.
____ 9. Load the DACCF configuration utilities software.
____10. Format the drives (use the DACCF Tools
Format Drive
utility).
____11. Configure the Drive Groups (packs) and the logical units (System Drives).
____12. Initialize the logical units.
____13. Install any required network operating system drivers (from Software Kit).
____14. (Optional) Install the Global Array Manager array monitoring software.
Summary of Contents for DAC960PG
Page 1: ...PCI RAID Controller Installation Guide DAC960PG PCI to Ultra SCSI P N 771971 D01...
Page 2: ......
Page 10: ......
Page 24: ...DAC960PG Specifications 1 10 DAC960PG Installation Guide...
Page 35: ...Functional Description Manual No 771971 2 11 Figure 2 4 Configuration on Disk Flowchart...
Page 48: ...Cache Management 2 24 DAC960PG Installation Guide...
Page 76: ...System Reboot or Power Down 4 10 DAC960PG Installation Guide...
Page 78: ...SAF TE A 2 DAC960PG Installation Guide...
Page 90: ...Battery Backup Capacity B 12 DAC960PG Installation Guide...
Page 102: ...Glossary Glossary 12 DAC960PG Installation Guide...
Page 105: ......
Page 106: ......