Installation
Branches requires a -12V /
+12V power supply (2x5 pin
connector). The ribbon cable
connector must be aligned
so that the red stripe of the
ribbon cable (-12V) is on the
same side of the module’s
power header as the “Red
stripe” marking on the board.
The power consumption is:
+12V: 10 mA; -12V: 1 mA.
The trigger/gate signals
generated by Branches
have a +5V level.
Online manual and help
The full manual can be found
online at:
mutable-instruments.net/mod-
ules/branches/manual
For help and discussions, head to:
mutable-instruments.net/forum
Branches
Dual Bernoulli gate
Please refer to the online manual
for detailed information regarding
compliance with EMC directives