25
8.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Service manual
MUEX-
H11 series
Summary of Contents for H11 Series
Page 1: ...Service manual www mundoclima com CL21400 CL21407 MULTI INVERTER SERIE H11 R32...
Page 11: ...10 MUEX 21 H11 3 MUEX 27 H11 3 Service manual MUEX H11 series...
Page 12: ...11 MUEX 27 H11 3 Service manual MUEX H11 series...
Page 13: ...12 MUEX 36 H11 4 Service manual MUEX H11 series...
Page 14: ...13 MUEX 42 H11 5 Service manual MUEX H11 series...
Page 73: ...www mundoclima com C N POLES 249 P1 08013 BARCELONA SPAIN 34 93 446 27 80 SAT 34 93 652 53 57...