OperatiOn
8. Place main circuit breaker (Figure 14) in the
ON
position.
Figure 14. Main Circuit Breaker (ON)
9. Read the voltmeter on the front panel of the generator
(Figure 15) and verify that 120 VAC is present at the
GFCI duplex receptacle. For additional verification of
voltage, an external voltmeter can be used to measure
the output voltage as shown in Figure 15.
Figure 15. 120V/GFCI Receptacle
10. Connecting of loads (power tools, lighting ect.) to the
generator receptacles can now be done.
stopping the engine (Normal shutdown)
1. Place the main circuit breaker (Figure 16) in the
OFF
position.
Figure 16. Main Circuit Breaker (OFF
)
2. Let the engine run at idle with no load for 2-3 minutes.
3. Place the
engine ON/OFF
switch (Figure 17) in the
OFF position.
Figure 17. Engine ON/OFF Switch (OFF)
4. Place the engine fuel valve lever (Figure 18) in the
OFF
position.
Figure 18. Engine Fuel Valve Lever (OFF)
5. Remove all loads from the generator.
Emergency Shutdown
1. Place the
engine ON/OFF
switch (Figure 17) in the
OFF position.
Summary of Contents for GAC2.2H
Page 9: ...gac2 2H 60 hz GENERATOR operation and parts manual rev 1 03 31 10 page 9 NOTES...
Page 13: ...gac2 2H 60 hz GENERATOR operation and parts manual rev 1 03 31 10 page 13 note...
Page 34: ...page 34 gac2 2H 60 hz gENERATOR operation and parts manual rev 1 03 31 10 generator assy...
Page 36: ...page 36 gac2 2H 60 hz gENERATOR operation and parts manual rev 1 03 31 10 CONTROL BOX assy...
Page 38: ...page 38 gac2 2H 60 hz gENERATOR operation and parts manual rev 1 03 31 10 PIPE FRAME assy...
Page 73: ...gac2 2H 60 hz GENERATOR operation and parts manual rev 1 03 31 10 page 73 notes...