Configuring the job computer
Field sprayer with two circulations and job computers
7
30303187-02-EN
V1.20180921
77
⇨
The following progress icon appears:
⇨
You must now start the calibration within a few seconds.
6.
- Start calibration.
⇨
Horizontal position is being saved as long as the
icon appears.
⇨
You have saved the horizontal position.
7.
Slope the boom to the right.
8.
- Calibrate the slope to the right. Proceed in the same way as for the horizontal
position.
9.
Slope the boom to the left.
10.
- Calibrate the slope to the left.
Field sprayer with two circulations and job computers
For field sprayers with two manifolds and booms, which are controlled by two job computers, you
must configure each job computer for the equipment of the respective boom.
There are also the following settings:
▪ You must decide which system should be the main system and which should be the auxiliary
system. On the main job computer, mark the 2nd [
78] connector parameter.
▪ You must set the geometry on both job computers. [
▪ You have to select an operating device for each boom. [
Field sprayer with two booms at the rear.
Main system
Auxiliary system
7.11