Operating the implement on the field
Stop seeding
7
30283620-02-EN
V3.20151130_rev.2
25
1.
- Start seeding.
Stop seeding
1.
- Stop seeding.
⇨
On the work screen, the following message appears: "Application is stopped."
⇨
All of the metering drives are stopped.
Adjusting the target rate during operation
You can adjust the target rate while working.
Function icon
Meaning
Increases the target rate.
The target rate is changed by the value that you defined in the "Adjustment"
parameter. [
Reduces the target rate.
Restores the target rate back to 100%.
You have defined [
Target Rate
" and "
Adjustment
" parameters.
1.
On the work screen, press:
⇨
Function icons for the adjustment of the target rate appear.
2.
,
or
- Change the target rate.
⇨
The target rate of the metering units will be changed:
⇨
The job computer regulates the seeding according to the new target rate.
Using tramline control
The job computer can help you to create tramlines for the tires of other vehicles, for example, a
sprayer.
A tramline is created by closing the seed tubes to the seeding coulters. This creates an area behind
the implement where there is no seeding.
When the tramline control is activated, the tracks are counted to create the tramlines for the defined
tracks. The tracks are counted as soon as the implement is lifted out of the soil.
7.5
Procedure
7.6
Procedure
7.7